Under the sky, above the loess, the heavy duty of Liugong

7July2018

Location: Wuzhou, Guangxi

Weather: Cloudy

Looking around,

Wherever you look,

Almost all of them are Liugong equipment.

Beginning in 2007, Guangdong's ceramic industry began to transform and upgrade under pressure. Guangxi Cangzhou City began to attract investment and undertake industrial transfer. The long-term planning of the ceramic production area in the development process is to introduce large-scale ceramic enterprises, form a ceramic industry cluster, and build it. Become a true 'Southern New Ceramics'. I believe that in the near future, ceramics will become the industrial card of Zhangzhou.

This year, the ceramics industrial park has newly entered a number of ceramic production-oriented enterprises, and the expansion of the industrial park has once again kicked off. The project construction period is very tight. The person in charge of the project said that the construction period is delayed by one day, which may be an economic loss of nearly 100,000 yuan. After repeated considerations, it was decided to use large-scale equipment for construction. This project used nearly 20 large-scale construction machinery and equipment, including 6 Liugong 950E and multiple 922E, and there are many large-scale loading machines such as Liugong CLG888 and CLG890H.

He said that when choosing equipment, the first consideration was efficiency.

Liugong CLG950E comes standard with 3.6m? bucket, which is the largest excavator in the same class of buckets in the industry. It is especially suitable for large loose earth and stone works, which require high loading efficiency;

The CLG890H and CLG950E are equipped with the imported Cummins QSM11 engine, which achieves high reliability and durability while achieving excellent fuel economy and power, thus obtaining more working time.

The CLG890H is one of the star products of Liugong large loader. It adopts the world's leading components, is highly efficient and reliable, and plays a heavy role in various large-scale projects such as mines and ports.

Now the project is implemented in three shifts, 7:30 in the morning - 12 noon, 13 in the afternoon - 18 in the evening, 19:00 in the evening. 'Liugong's equipment is very powerful, never lost the chain. We believe that this project must be Can be completed ahead of time. 'The project leader is quite convinced.

2016 GoodChinaBrand | ICP: 12011751 | China Exports