According to official data, as of the beginning of this year, the Tibetan economy has achieved double-digit growth for 25 consecutive years, and infrastructure conditions have also improved significantly.
The development of infrastructure construction is inseparable from the construction of commercial buildings, and the necessary equipment for commercial construction is concrete mixing station. In order to support the infrastructure construction in Tibet, in recent years, many concrete mixing plant equipments developed and manufactured by Great Wall Construction Machinery have been built. From the Great Wall Construction Machinery Headquarters, all the way to the west, to the Tibetan Plateau with an average elevation of more than 4,000 meters, the purpose is only to support the local infrastructure!
Recently, another set of Great Wall Construction Machinery hzs120 engineering concrete mixing station was built at the construction site of a project in Tibet area with an altitude of more than 5,000 meters.
This set of hzs120 engineering concrete mixing plant equipment not only includes Js2000 forced mixing mainframe, but also belt conveyor, four warehouse batching machine (PLD3200 batching machine), screw conveyor, conveyor belt, computer control room and other necessary accessories.
This Js2000 forced mixer designed and produced by the Great Wall Construction Machinery is a high degree of automation, good mixing quality, high efficiency, low energy consumption, low noise, easy operation, fast discharge speed, liner and blade service life. Long, convenient maintenance and other advantages of mixing equipment.
The scenery in Tibet is pleasant, but the climate is changeable. Oxygen is thin, often snow and snow, and the sand is dusty. According to local conditions and customer requirements, the equipment has been sealed and designed to avoid dust.
'The plateau lacks oxygen, but the Great Wall people never lack morale'. In order to speed up the use of the hzs120 engineering concrete mixing plant, the entire construction period is guaranteed to be on schedule, the construction site is lack of oxygen and dizziness, the sunshine is strong, and the temperature difference between day and night is large. There is no way to block the footsteps of the Great Wall people. After the intense construction and installation cycle, the after-sales engineers of the Great Wall Construction Machinery won the favor of customers with a high degree of responsibility.
At present, the hzs120 engineering concrete mixing plant is in service in Tibet, and the Great Wall Construction Machinery is once again fortunate to contribute to Tibet's economic construction.