According to the Bloomberg report, according to the federal 'Clean Water Law' regulation, the government of the state of Vevey has the authority to issue stormwater drainage permits for industrial zones, requiring the industrial zone to ensure that the surface water, groundwater, and wetland water quality remains constant during heavy rainfall and precipitation.
The new Hon Hai plant will cover approximately 22 million square feet of loose soil. During heavy rains, large amounts of rainwater will often seep into the ground and then flow into the Des Plaines River, which may cause more flooding in northern Illinois. In addition, the plant area In the nearby roads, the bridges are supported by pillars, built or widened, making the land more capable of absorbing heavy rain.
Before the operation of Hon Hai, it is necessary to obtain a wastewater treatment permit issued by the Racine County Government. Hon Hai has obtained the air emission permit required for the construction of the plant, but the air emission permit required for operation will be issued later; Sexual waste permits will be issued at a later stage depending on the progress of the plan.