On June 5th, the Inner Mongolia Jiutai New Material Co., Ltd. annual output of 1.8 million tons of coal PTA project seminar was held in Hohhot.
At the seminar, 14 experts and scholars from Tsinghua University, CNPC Consulting Center, PetroChina East China Design Institute and other units conducted in-depth discussions on the construction scale, investment environment, necessity of project construction, and feasibility.
It is understood that Inner Mongolia Jiutai New Material Co., Ltd. invested 11.7 billion yuan in the Toqing Economic Development Zone in Hohhot, and the project to build a coal-to-glycol plant with an annual output of 1 million tons was started in September 2017. The proposed annual production of 180 The 10,000-ton coal PTA (pure terephthalic acid) project is planned to invest 30 billion yuan. The technological achievements of this project have been independently developed and developed by Tsinghua University, and it has reached the international advanced level. It is the conversion of existing chemical products as secondary raw materials. , Adding value again, extending the industry chain downstream and terminal.