In Chaoyang District, Beijing 18 Li Shop area of the west Straight river, the past can only be used for landfill and stacking of construction waste is processed into recycled road materials, recycled wall materials, recycled concrete aggregates, such as different kinds of recycled products, the realization of the construction of garbage waste to treasure.
Photo: Zhengzhou Peak Beijing Chaoyang District Construction Waste Recycling project site
Site: Construction waste mobile production line to achieve on-site construction waste disposal In Chaoyang District, 18 Li Dian Zhen Xi Zhi River demolition scene, a five-storey dormitory building is being demolished work.
And at the same time in the on-site installation of construction garbage mobile production line, including construction waste special mobile crushing station, mobile screening station, through the excavator to the construction waste from a head into, after crushing screening, spit out the recycled aggregate can be reused. In recent years, 18 of shops in the township to dismantle the strength of the increasing, only last year, the demolition of 4.3 million square meters, resulting in a large number of construction waste.
In the case of garbage production, in the past, simple and extensive landfill is not suitable for social development needs, so the introduction of professional construction waste resources to use a complete set of equipment, including construction waste disposal mobile crushing station and mobile screening station, Zhengzhou Peak Engineering Technology Co., Ltd. to provide, and under its guidance for planning and processing. Zhengzhou Peak Building waste complete sets of equipment can be implemented green treatment, can be demolished building garbage such as windows, doors, sofas can be crushed, plastic products, glass can also be recycled.
After the green treatment of the construction rubbish mobile production line of Zhengzhou Peak, the resulting building rubbish can be converted into aggregates and used as building materials in the future.
Planning: Recycling of construction waste to promote urban development In the past, how to deal with construction waste has been a thorny problem faced by urban construction. According to statistics, 2017 Beijing building demolition of 59.85 million square meters, 2018 will also implement 40 million square meters of building demolition, building garbage rapid growth of the construction of garbage, to the city's development and construction put forward a new topic, do a good job of building waste disposal is imminent.
It can not only reduce the pollution to the environment, but also realize the recycle utilization of waste resources by means of disposing the waste resources.
Policy: Encourage the construction of temporary treatment facilities to strengthen the comprehensive utilization of construction waste Recently, the Beijing Municipal Construction Commission in conjunction with the Beijing Development and reform commissions and other 10 departments of the "on further strengthening the comprehensive utilization of construction waste resources" advice, "opinion", the government is the building waste resources comprehensive utilization of the responsibility of the main body, the city should be clear comprehensive utilization of construction waste Management department To be responsible for the management of the comprehensive utilization of building waste resources in this area, and to co-ordinate the disposal of the construction waste from the illegal construction by means of the government purchasing service, and coordinating the urban ' relief and promotion ' and other kinds of funds. The disposal cost standard can be piloted according to no higher than the current construction waste disposal fee standard 150% execution.
In addition, the resource disposal enterprise may enjoy the tax preferential policy according to the related stipulation. Zhengzhou Peak as a professional production of construction waste treatment equipment, construction waste disposal equipment, mobile crushing station, mobile crushing production line and the provision of building waste resources to use the complete program of the enterprise, with building garbage treatment leading technology, well-equipped, in the nationwide production operation!
Have the investment intention, may go to Division I as well as the project On-the-spot inspection, the contact method: 0371-53738676 or 18903832576! Realizing the resource utilization of construction waste in Zhengzhou Peak mobile crushing station