Author: HONT-Fisch Switch socket installation height: One, restaurant/living room?????? 1, in addition to the design requirements outside the general outlet from the ground 300mm. 2, background wall outlet
2.1, If the power cable is hidden, the video cable should be installed below the TV cabinet surface, generally 200-300mm away from the floor. 2.2, If the socket is installed in the floor 450-500mm above the TV cabinet, according to the purpose of the equipment, the actual requirements can be installed above the socket. 2.3, TV wall height screen centerline distance 1200mm, according to the actual situation can be adjusted to install 1400mm. Wall TV power height is determined according to the space size and TV size, the general height of 1000-1200mm. 2.4, reserve a 50PVC pipe, as a film and television threading pipe, hide the film and television line to achieve beauty. 2.5, need audio surround system default audio jack. Second, bedroom ???/study????????????? 1. The living room lighting should be installed in front of the entrance door and in front of the bedroom door with dual control switches. The bedroom lighting should be installed in the bedroom door and the bedside with dual control switches. The bedside dual control switch and socket are installed above the bedside cabinet. 600-750mm???. 2, air conditioning hook socket 1800-2000mm. Install 16A three-hole socket. ????????? 3, the installation height of the headboard wall lamp, it is recommended to install the height of 1500-1700mm. 4, computer desk and other desktop sockets from the ground 900mm. 5, old man room can be preset caller system. Third, the bathroom 1, washing machine socket 1200mm or low plug 350mm. Note: Do not install the washing machine behind the low plug. 2, electric water heater socket 1800-2000mm, to consider where the electric water heater is placed. Install 16A with three-hole switch socket, and install splash box. 3, toilet 350mm retrofitted splash box. 4. Two sockets (hair dryer, sterilized toothbrush holder) are reserved at the lavatory basin. The height and the level of the switch are 1300-1400mm. 5, lighting switch from the ground 1300-1400mm, 100-200mm away from the door. (The same height in the same room). Fourth, the kitchen?????????????????? 1. All kitchen countertops are 1100mm from the floor, it is recommended to install five-hole socket with switch. 2. The range hood of the range hood is generally 1800-2200mm from the ground, or 2200mm from the floor in the stainless steel hood of the hood. It is combined with the stove top and the height of the console to select the best location. 3, gas water heater socket is generally 1800-2300mm away from the ground. The socket must consider the distance from the flue. 4, refrigerator socket is best placed on both sides of the refrigerator from the ground to insert 1300mm, low plug 500mm. 5, mini oven/microwave oven: The general socket is 1600mm away from the ground, self-adjusting according to the placement position. 6, water purifier, small kitchen Po from the ground 500mm, placed in the sink cabinet. Socket installed splash box. 7, according to the use of electrical equipment (dishwashers, vacuum cleaners, linked to hot machines, etc.) socket reserved. 8, the gas alarm is reserved for a socket, the installation height is determined according to the actual situation of the gas field. Circuit???reconstruction note: 1. The installation position and quantity of switches and sockets should be carefully considered when wiring. The principle is more than appropriate. 2. Under normal circumstances, the zero line is blue, the fire line is red, and the ground line is a yellow-green two-color line. 3, The entrance line section should not be less than 10 square millimeters. The lamp should be 1.5 square millimeters. The switch, socket, and ground wire should be 2.5 square millimeters. The air-conditioning, water heater and other high-power electrical appliances should be routed separately by 4 square millimeters. , Socket uses 16A three-hole socket. 4, the same room switch or socket should be the same height. 5. Principles for the construction of hydropower: First consider the laying of the ceiling. If the top of the ceiling cannot be laid, consider the laying of the wall. The wall cannot be laid. Finally, consider the ground laying. The power cord of the ceiling is laid inside the ceiling or plaster line to facilitate overhaul. . 6, in the laying of the wire process, to follow the 'hot line into the switch, the zero line into the lamp' principle; socket wiring to do 'left zero N right fire L, ground PE in the' or 'under fire zero'. To prevent children from getting an electric shock, use a finger or a metal object to plug in the power hole. Always use a safety socket with a safety cover. In addition, you must switch the power supply on and off. Consider using a switch outlet. 7, network lines, telephone lines, television lines can not be worn in the same pipeline with the wires. 8. Newly-connected film cartridges and cable boxes are to be connected with locks. - author: HONT-Fisch |