To ensure the normal operation of equipment and safe production, users should pay attention to the production workshop downtime and equipment maintenance.
The following is the Borch machine stop, boot recommendations:
Borch injection molding machine in the adaptation of the environment can shift work 24 hours, but for a long time in the working state of the machine, be sure to do a good job of maintenance work, to prevent problems due to lack of maintenance and safety problems, to be able to ensure the normal and stable machine Running and normal service life.
Downtime preparations
1. Maintain the injection molding machine clean, the body around to keep the road open.
2. Check the mold installed in the lock head plate and moving the template is solid, shut down more than a week it is recommended to remove the mold.
3. Intelligent two-plate injection molding machine clamping brake in place (do not afford high pressure); three injection molding machine clamping mechanism is in the mode of 1-5mm. If the mold should not be locked under high pressure, to prevent the mold can not be opened.
4. Maintain four Gelin Zhu, adjusting mode gear, rod thread cleaning.
5. To keep the guide rail lubrication and cleaning platform to keep the radio table surface clean.
6. The machine (oil, waste water / oil, fouling, etc.) clean, and then full protection is good, to avoid prolonged downtime rust stuck.
7. The plastic barrel should be cleaned, with PP plastic cleaning cartridge inside the residue.
8. Cut off the water and empty all water that may accumulate water (coolers, drains, molds, etc.).
9. Cut off the power switch should be detected after the device is completely powered off, available pen to confirm that the power has been off.
10. Clean the box dust, grease, and waterproof box, moisture-proof, anti-rat measures to ensure that the electric door closed state.
Boot preparations
1. Check the machine for any abnormal damage, downtime, please do a good job cleaning
2. Open the water supply valve, check the cooler, water tank, pipes and other water equipment for leakage and solve the problem.
3. Detection of oil temperature is accurate, the cooling system is working properly, the oil temperature should be maintained at 30-50 degrees Celsius, the oil level should be above 30%.
4. Check the machine no break or short circuit and then put the total power switch, and then check the device voltage is normal, no leakage situation.
5. Check the electric box cooling fan is working properly, high temperature easily damaged electronic board.
6. Check the mold is securely installed in the lock head plate and move the template.
7. Detection Press the emergency stop button to immediately cut off the pump motor power.
8. Check the safety gate travel switch without loosening / misplacing, the front security door opened to stop the clamping and injection action.
9. Set a stable pressure and speed activities of the mold clamping and shooting table structure, to determine the normal operation of the machine, and full lubrication.
10. Check the fuselage, valve plate and other leaks and reinforcement solution.
11. Regularly check the quality of oil and oil level to confirm the lubrication system is working properly, according to the instructions required to join the appropriate type of lubricant, not to join / recycling of used oil.
12. After setting the temperature to heat the barrel, the temperature should be maintained for more than 20 minutes to ensure that all parts of the temperature uniformity.
13. When the melt tube does not reach the pre-set temperature, it is not allowed to make the adhesive, glue and cable (loose back) action to avoid damaging the rotating system components.
14. Please pre-production and injection molding, raw material suppliers to confirm the current machine screw can meet the demand.
15. Check the heating ring no bag breakage, temperature control and no leakage.
16. NOTICE Cooling water and hydraulic fluid can not flow into the control box and must be de-energized immediately if possible.
As in the actual use of the encountered problems, feel free to call the Bo Chong National Customer Service Hotline: 400-655-9488, Bo will provide a full range of help and cooperation.