As of January 31, Lanzhou Petrochemical Ethylene Plant polypropylene plant at the end of January began production of medical polyolefin products RP260 3,500 tons to complete the task of production, a single batch of new record production volume for the new year, a good head start production profits.
Previously, RP260 products yield up to a maximum of 2,000 tons per month, the production plan for the production of 3,500 tons. Continuous production of polypropylene workshop, polypropylene plant silos, packing line packaging and operation of packaging and maintenance are under pressure. Plant attaches great importance to the face of the tension of propylene raw materials, and actively coordinate the company for raw material supply, effectively protect the smooth production of medical materials.
Polypropylene workshop composed of medical materials RP260 production inspection team, with the team on the relevant key equipment repeatedly investigation, according to the medical material conversion of 14 specific projects, one by one to confirm the workshop staff in advance to the wind send system control valve, three-way valve and other parts in operation During the inspection of the work status, replacement and cleaning of multiple typhoon inlet filter, said screw parts and pelletizing water filter, pre-cast demineralized water, added to the pelletizing tank replacement, to ensure that they meet the standards of medical materials purified water .
January 26, the device began converting medical materials RP260, staff positions on each process control point, precise control of the valve, in strict accordance with the principle of step by step to confirm the operation during the repeated sample analysis and confirm the norms to seriously implement each control Measures to ensure that the product quality indicators to achieve the expected production targets.