January 17, from the Beihai oil transformation project in Guangxi - Bose replacement pump project was informed that the construction by the four companies in Guangxi Beihai oil transformation project - Baise replacement pump project Recently, with the main pump base open Dug, replace the oil pump inspection and maintenance project was officially started.
Construction of the four companies built by the North Sea in Guangxi Oil Transformation Project - Bose replacement pump project is the first inspection and maintenance projects in Guangxi Petroleum Engineering in 2018. The replacement pump project involves equipment, process piping, electrical, instrumentation and control Civil engineering, hoisting, etc. As the project involves a number of construction professionals for the project department's ability to work is a great test, and the construction area in the station interior, the surrounding area is the original gasoline pipeline, diesel pipeline, The project construction department of Si Jian Company has repeatedly conducted construction docking with Guangxi Petrochemical Company and Sinopec Luoyang Engineering Co., Ltd. and finally discussed and discussed the final design of 1 # pump, 10 # pump, 2 # Pump, pump # 5 reconstruction program. Four construction company project department in the construction process, from the isolation to the foundation excavation, installation from the pump to the installation of electrical instrumentation, debugging from the pipeline drain to the welding flaw detection test from the test Pressure purge to the process of recovery, the work done fine, and combined with the construction of the project to develop a set of 10 special programs, at the same time require the construction management to enhance the safety and quality of construction operations Control grid, to ensure excellent shot.