'This is the printer that installs for the company!'
On January 16, the 8.3MW roof-top distributed photovoltaic project of Beijing Shougang Cold-rolled Sheet Co., Ltd., invested by Zhongqingneng Oasis Technology Co., Ltd., was formally put into operation. During the online conference, a number of energy sources issued A similar feeling.
The 8.3MW rooftop distributed photovoltaic project of Shougang Cold Rolled Sheet Co., Ltd. is by far the largest single distributed photovoltaic power generation project in Beijing and a key project of the 'Big Five Sunshine Project' in Beijing.
On behalf of the peak in the oasis can save the peak introduction, the project uses cold-rolled sheet of 100,000 square meters of plant roof, the installation of photovoltaic modules, and grid operation, annual production of about 8,200,000 degrees of clean and reliable high-quality photovoltaic 'Green', the equivalent Saving 3276.36 tons of standard coal, 8166.33 tons of carbon dioxide emissions and 245.73 tons of sulfur dioxide each year, making contributions to the use and promotion of clean energy in Beijing. It also conducts a useful exploration for the development of new energy in Beijing's traditional manufacturing industries.
Yao Shun, general manager of Shougang Cold Rolling Company, introduced the project can bring very substantial economic benefits, can achieve 100% consumption, can supplement nearly 10% of the company's power consumption, annual savings of 3 million yuan in electricity, 25 years of operating cycle Total accumulated savings of about 80 million yuan of electricity.
'We also need to consider the indirect benefits of photovoltaic power generation, including reducing the energy costs of indoor HVAC, keeping warm and cool at room temperature, reducing roof maintenance costs, extending the life of the roof waterproofing layer, etc.' Yao Shun told reporters.
'The project is fully designed in terms of load-bearing structure, installation, construction and operation and maintenance according to the roof condition in the factory area, and the vacant space on the roof can be reasonably and efficiently utilized to ensure the power generation benefits. "The project leader of Zhongqingnei Oasis said.
For the construction, TBEA and Shougang Construction indicated that we strictly operated in accordance with the safety construction standards and strictly implemented the PC project management body in the construction process, which did not affect the normal production operation in the factory and achieved construction safety without violation, zero accident, excellent quality and put into operation After running reliable target.
Survival peak told reporters: 'Photovoltaic power generation industry, China has been leading the development of the world over the years, from the cost of 3 yuan 10 years ago, the current cost of 6-7 cents, which makes the technology from the original The high dependence on subsidies has become a real benefit to businesses now. '
Shougang distributed photovoltaic power generation project with the in-depth participation and support of all parties to build is also a win-win project for all parties to obtain revenue, Shougang harvested more clean and low-cost green electricity, while reducing costs and increasing efficiency but also demonstrates the business Of the social responsibility; for professional development investors, access to 25 years of stable operation of quality assets; and Beijing municipal government and Shunyi district government through effective support policies to achieve the goal of energy-saving emission reduction; urban residents get More blue sky and a healthier living environment.