On December 29, 2017, the limestone squash project invested and constructed by Shanghai DaYuan Environmental Science and Technology Engineering Co., Ltd., which was constructed by the four-built northwest branch, was successfully dumped once.
Shanghai Dali Raw Lime Ball Project is an environmental technology project located in the acetylene workshop of Sinopec Great Wall Energy & Chemical Ningxia Co., Ltd. This project is an industrial project of "efficient, safe and environment-friendly" encouraged by the State. The purpose of the construction project is to control lime Dust pollution, improve production efficiency, reduce "three wastes" emissions, saving energy consumption.
Since the project was started in May 2017, the employees of Si Jian Company braved the harsh construction environment of high concentration dust pollution and overcame a variety of unfavorable conditions, scientific organization, careful arrangement, fine construction and continuous fighting for 7 months Of the time to complete the installation of 420 tons of steel structure, pressure ball complete sets of equipment and various types of transmission equipment installation and commissioning of 27 sets (sets), cable 10 km, etc. High-quality completed the construction of the project. The success of the investment is the new chapter of SJTU participating in the environmental protection project construction and making due contributions to the environmental management and production efficiency of Sinopec Great Wall Energy and Chemical Industry Park.