Xiaoyi, Shanxi Photovoltaic Poverty Alleviation Pilot Project first grid-connected power generation

November 28, the reporter was informed that, Xiaoyi Lake, Shanxi Province, Xiaoxi Lake Street Office Polaroid Pilot Project for Photovoltaic Poverty Alleviation and power generation has become the city's first grid-connected photovoltaic thin-film photovoltaic poverty alleviation project to achieve the street 57 Full coverage of the deep-seated poverty-stricken population, and each of them will receive a steady income of 3,000 yuan a year and sustainable benefit for more than 20 years, which is a new way for the city to promote industrial poverty alleviation and explore accurate poverty alleviation.

It is reported that the project is located in Fengjiayu Village Wankelong Building Materials City, the use of Hanergy thin film photovoltaic power generation system, the current seven buildings are all installed roofing, construction area of ​​4,800 square meters, with a total installed capacity of 231.12 kilowatts, a total investment of 2.43 million yuan, It has been estimated that 379614 kilowatt-hours of electricity will be generated in the project and the revenue will be 327,670 yuan, of which 60% will be used to build up the card-bearing poor households, which is about 193,600 yuan and 30% for the weak collective economy , About 96,800 yuan, for the street collective economic income of less than 100000 yuan in 5 villages each village income 19,300 yuan, the remaining 10% for normal operation and maintenance.The project not only solved the poor households without labor, Lack of platform and difficult development, widened the long-term and stable channel for income increase of the poor and also fundamentally solved the problem of weak rural collective economy.

At the launching ceremony on the very day, the city signed a "Framework Agreement on Strategic Cooperation for the Comprehensive Promotion of Thin Film Solar Power Generation" with Hanergy Household Membrane Power Generation Technology Co., Ltd. Both parties will jointly push ahead with the 4.125 MW project with a total installed capacity of 500 Build a file card steady increase in income.

2016 GoodChinaBrand | ICP: 12011751 | China Exports