Recently, the first piece of head forgings of Fanglong Port project for "Hualong No.1" was completed in China for the second batch of finishing operations of China National Machinery Group (Group) Co., Ltd., and witnessed by Suzhou Thermal Power Plant, China Guangdong Nuclear Power Engineering Corporation and Orient Heavy Machinery. Qualified, through the joint inspection, the successful production.
This product is China's second largest for the China Guangdong Nuclear Power Engineering Co., Ltd. to undertake the first set of 'Hualong 1 nuclear island large shaped forgings for Fangchenggang project No. 3 steam generator parts of its steam generator equipment by the Canadian BV Company Designed jointly with China Guangdong Nuclear Power Design Institute, it is the third generation nuclear power technology with the highest safety standards in the world. The density, grain size and cleanliness of molten steel are particularly high. The performance and inspection requirements of forgings are greatly Higher than the CPR1000 technical specifications, and simulated welding heat treatment time also increased significantly, is China's second-tier nuclear forgings comprehensive manufacturing capacity of the great test.
'Hualong No.1' forging quality improvement is an important quality improvement project in China during the second quality year and also a key project for the prevention and control of quality risk of the group company.Previously, the quality risk prevention and control measures of this project are on the 'Hualong No.1 Cylinder forgings production has been well used in manufacturing, high-quality, high efficiency of the finished delivery, highly praised by the owners.