As of November 19, Sinopec Zhenhai refinery ethylene production exceeded 1 million tons, up 2 days earlier than last year, except for the year of maintenance in 2014, the company's ethylene production has exceeded six million tons, the economic indicators Are to maintain a good level.
Zhenhai Refining & Chemical strives to eliminate unfavorable factors such as the end-of-operation period of the plant, and takes "a stable and optimized" as the main line to strengthen production management and safety management and improve the economic benefits of the plant.
To carry out innovative research to solve production problems.Zhenhai Refining and Chemical and Beijing Institute of Chemical Cooperation to optimize the pyrolysis furnace scorching process, cracking furnace burned conditions significantly improved.Using the top of the rectification tower material without disturbance backflushed tower at the bottom of the guarantee Installation of normal load, based on qualified products, cracked ethylene cracker debutanizer coking industry problems.
Zhanhai Refining and Chemical will keep track of the price and trend of downstream chemical products in real time, use SPYRO software to accurately configure the chemical plant resources and optimize the crack depth control of ethylene pyrolysis furnace in real time with APC project. In the meantime, minimizing the loss of products, the comprehensive energy consumption of the installation dropped drastically, setting the best record for the same period in history.
Focus on the safety management difficulties, carefully find the hidden dangers of the device.Alkene Department sorted out 20 'low standards, old problems, bad habits' and repeated post-examination problems, and strive to break through one by one.Use 'pick up the gold' mechanism to motivate staff to actively find Hidden dangers, lay a solid foundation for safety production. As of the end of October, reward 794 people.