On November 16, China National Coatings Industry Association approved the release of the group standard "Indoor Wall and Wood Recoating Services and Acceptance Procedures (T / CNCIA02002-2017)", which is designed to ensure that indoor wall and wood recoating services Quality and environmental protection to meet the requirements, and at the same time to ensure that customers home items from construction impact and improve service quality.It is reported that this is China's first recoating service standards.The standard will be January 1, 2018 formally implemented.
1 recoating service should be based on the principle of least impact on customers to ensure that the construction process and the environmental protection of the indoor environment after construction.
2 recoating services should comply with the construction of various parts of the construction and decoration specifications to ensure the quality of construction.
3 Implement a uniform 'service standard' for all customers.
3.1 All re-coating service customers can get the basic inspection diagnosis, shelter protection, professional construction, clean homing four services.
3.2 In the provision of basic inspection for the client, the base examiner will use the range finder, hygrometer, hollow hammer, square ruler, ruler and other tools for professional measurement and testing at the grassroots level to provide customers with a tailor-made construction Program, in the program will propose a reasonable wall treatment and meet other customer needs a comprehensive solution, and calculate the service budget.
3.3 Under the premise of the customer acceptance, the recoating service provider shall sign a standard closed contract with the customer. The contract involves wall treatment (including the relocation of furniture, home cleaning), wall paint, wood paint and other special effects construction Once the customer signs the contract, he / she will enjoy the protection of no fare increase midway unless the following two types of examiners can not be foreseen as an exception. The first is that the old limestone sand plastering material is covered by the sturdy surface material Leveling layer, this situation requires an additional full eradication; the second is the customer's own request for additional items.
3.4 Customers once signed the contract to enjoy the warranty from the date of acceptance of one year warranty; service providers should provide timely notification to the customer the construction process of service.
3.5 All construction sites to implement a unified site code.
3.5.1 The image of the construction personnel norms: should be dressed in re-painted service unified work clothes, wear a work card, dress neat; in the shelter has not been protected on the ground should be worn shoes walking.
3.5.2 code of conduct for construction workers: polite admission, leave; patiently answer customer questions, in case of business problems beyond the construction should help customers and business contacts; civilized, the construction site can not smoke, can not eat, can not accept Customer-given food and cigarettes, can not use the bathroom in the client's home without permission.
3.5.3 Construction personnel to implement the safety norms: safe use of water and electricity; should use aluminum standard ladder and horse stool for climbing construction. Can not use self-made wooden ladder to climb construction; above the second floor of the open balcony ascended the top treatment should be safeguarded Measures should be taken with dust masks polished, spray goggles should be taken with the necessary labor insurance equipment.
3.5.4 Tools and Equipment Material Specifications: Standard tools should be used, including professional grinding tools and equipment, airless spraying machine (if necessary spraying), electric mixer, designated tools, accessories and protective materials; Standard display, and warning signs should be set to ensure the safety of on-site personnel and does not hinder the construction.
3.5.5 Important or special site construction should be issued by the program before the base inspection service staff on-site technical personnel to explain.
3.5.6 Each site will be subject to at least 1 inspection at any time. The inspection content is the standard for the construction phase (see the ideal state of each stage later). If there is any discrepancy with the standard, rectification should be done on site, And was recorded.