October 24 afternoon, 38.578 meters long, weighing about 260 tons of Zhenhai refining and hydrogen production of raw materials to adjust the structure of the project (Zhenhai POX project) absorption tower on the elevation of 60 meters in height and previously installed in place under the absorption tower in the next docking The tower is 3.3 meters in diameter, 98 meters high, lifting weight of about 780 tons, by the Ningbo Engineering Company under the Of the Ningbo Tianyi manufacturing company to undertake manufacturing and processing, the upper and lower sections of the lifting of the Group by the Refining and Chemical Engineering Corporation Ningbo Branch of the implementation of the installation of the tower on the lower part of the docking to complete the follow-up to the entire tower to implement the hydraulic test to create the conditions The
The picture shows the upper tower lifting tower lift
The picture shows the upper tower lifting tower lift
The picture shows the upper tower lifted upright
The picture shows the upper tower lifted upright
The picture shows the upper tower lifting tower to 60 meters high altitude
Figure for the upper and lower absorption tower at 60 meters altitude to complete the docking together
Figure for the upper and lower absorption tower at 60 meters altitude to complete the docking together
The picture shows the lifting of the Ningbo branch hoisting operations personnel to do the upper part of the absorption tower hoisting preparation
The picture shows the lifting of the Ningbo branch hoisting operations personnel to do the upper part of the absorption tower hoisting preparation
The picture shows the upper tower lifting tower lift